Siirry pääsisältöön

Tätä termiä ei ole vielä kirjoitettu englanniksi. Tässä se on kielellä English.

Work stage

A work stage is where the job is done: brief, edit, in progress, produce, investigating. It can create tasks with a role, an estimate in minutes, and a service window in hours. Leaving it may require the checklist to be done.

Most stages in every pack are work. The type matters because the engine treats approval, review, gate and done differently; work is the default doing.

A service window on a work stage is displayed and measured. It does not lock the card in place. An approval window is what reminders chase.

Usein esiin nousevat kysymykset

Does a work stage create tasks automatically?
When the pack names tasks on the stage, entering the stage creates them with the role the pack set.
What is ALL_CHECKLIST_DONE?
A transition condition. The item cannot take that transition until every task on the stage checklist is done.
Is done a work stage?
No. Done is its own type. It is the end of the path.

Aloita ilman korttia

Neljätoista päivää, kaikki ominaisuudet käytössä. Avaa työtila, kerro AI:lle miten työskentelet ja kutsu asiakas hyväksymään.

Kysyttävää? Kirjoita meille

Vastaamme suoraan sivustolta, kun pystymme, ja ihminen jatkaa tarvittaessa. Ei postituslistoja.